QUT Gardens Point J Block Workshop
Queensland University of Technology

Project Size
850m2
Project Cost
$1M – $3M
Project Duration
19 weeks

Our team delivered the refurbishment of QUT’s heritage-listed J Block Maker Space, creating modern workshop facilities for design students while preserving the building’s architectural character. The result is a flexible, future-ready learning environment that seamlessly balances heritage conservation with contemporary functionality.

  • Heritage arch restoration
  • Live campus environment
Capabilities
Refurbishment
Engagement Type
Lump Sum
Sector
  • Education
Subsector
  • Universities
Specialty
Heritage
Live Environment
Occupied Space
Team
Jamie Watkins
Tristan Turnbull
Cello Hansen
Hamzah Hassen

The Brief

We were engaged to refurbish the Level One Maker Space within QUT’s heritage-listed J Block at the Gardens Point campus. The facility supports design students through design development and model-making activities, and the project sought to consolidate multiple workshop disciplines into purpose-built spaces with upgraded services, enhanced functionality and improved finishes.

A key project driver was delivering contemporary workshop environments while preserving the architectural character and heritage significance of J Block. The works were delivered across two stages, ensuring critical teaching spaces were available for Semester One while maintaining continuity for university operations.

Our contribution

Delivering works within a heritage-listed building required a thoughtful and collaborative approach. Our team worked closely with QUT, consultants and specialist heritage contractors to ensure all upgrades respected the building’s existing architectural fabric while supporting its long-term use and maintenance.

The refurbishment included upgrades to key workshop areas, including the Laser Lab and workshops D01 and D07, alongside the integration of new services and specialist installations. Through early planning and proactive stakeholder engagement, we successfully navigated the complexities of working within a heritage environment, balancing modern workshop requirements with heritage preservation outcomes.

A strong focus was placed on achieving the best architectural result. By carefully coordinating heritage-sensitive works and addressing existing building conditions, our team ensured the upgraded spaces complemented the character of J Block while providing a high-quality and functional environment for students and staff.

The remarkable project outcome

The refurbished J Block Heritage Workshop provides QUT with a modern, flexible and future-ready workshop environment that supports innovation, collaboration and hands-on learning.

By successfully integrating contemporary workshop facilities within a heritage-listed building, the project preserves the architectural significance of J Block while enhancing its functionality for future generations of students. The result is a carefully considered heritage refurbishment that demonstrates our expertise in delivering complex projects where heritage outcomes, architectural quality and user experience are equally important.