Biosustainability Hub

On Level 11 of the Andrew N. Liveris building, the Biosustainability Hub features 745m2 of state-of-the-art PC2 and DAFF BC2 laboratories, an OGTR PC2 Large Scale facility and 500m2 of offices, meeting rooms and amenities, with airtight construction and highly coordinated services, this facility positions UQ as the leading University in Australia in decarbonisation and sustainability using biological solutions.
The Gresham Bar heritage ceiling restoration

We worked closely with the University of Queensland and heritage architects to restore the ornate heritage ceiling of 308 Queen Street – an iconic Brisbane site now occupied by The Gresham Bar. The ceiling was in significant disrepair, requiring careful remediation to preserve its historical character. Our goal was to bring the space back to life while protecting key heritage features, including the decorative rose and original cornices. The result is a revitalised space that respects its architectural legacy and continues to serve as a vibrant part of Brisbane’s cultural fabric.
QUT Gardens Point M Block Electrical Upgrade

We successfully delivered a complex electrical infrastructure upgrade to QUT’s six-storey M Block at the Gardens Point campus, ensuring the building is now fully self-reliant and ready to support future laboratory expansions. The project involved constructing a new main switchroom, generator enclosure, and external riser structure, along with the installation of a 500kVA generator, new main switchboard, UPS, sub-main cabling, and associated mechanical, fire and hydraulic services. Delivered within a live research facility during peak university periods, our team maintained uninterrupted campus operations through strategic staging, two dedicated site managers, and close collaboration with QUT and the consultant team.
Customs House re-roof and dome refurbishment

Working closely with UQ and heritage specialists under an ECI model, we provided early design input, buildability advice and value engineering to protect the dome’s integrity while meeting modern standards. Our team carefully restored original elements, replicated intricate copperwork, and upgraded the drainage and structure – all while the venue remained fully operational.
QUT Kelvin Grove X Block Levels 5 & 6

The Kelvin Grove X Block refurbishment transformed Levels 5 and 6 into modern office spaces. Delivered on time, within budget, and stress-free, this live-campus project ensured minimal disruption, showcasing our expertise in complex education environments and stakeholder collaboration.
Avalon Theatre

Under an ECI to D&C contract, we restored UQ’s Avalon Theatre, combining heritage preservation with modern functionality. By managing design, cost, and environmental challenges, we ensured a stress-free, on-budget delivery, transforming the space into a premier teaching and performance venue for students and the community.
Minderoo Plastic Free Lab

The University of Queensland’s Minderoo Centre Plastics and Human Health Laboratory, a world-first facility, enables critical microplastic research. Our team collaborated to ensure containment standards, minimal microplastic contamination, and functionality, delivering an award-winning, innovative lab supporting UQ’s research excellence.
Gordon Greenwood Level 4 South

The University of Queensland required a refined, versatile workspace on Level 4 of the Gordon Greenwood Building, balancing aesthetics and functionality for quiet work and events. We delivered bespoke joinery, lighting, and soundproofing within budget, transforming the space into an elegant, gallery-inspired environment.
Andrew N Liveris Pod Enclosures

Our team took on the challenge of designing and installing new perforated screens across 19 individual breakout spaces in the spectacular Andrew N. Liveris building. These screens add a layer of safety by stopping objects from falling through the balustrades while also creating a bit of extra privacy for students and staff as they work. The best part? The screens blend right into the existing design and elevate the functionality of the space.
Café C

UniSC aimed to revitalise Café C’s look and boost efficiency. Our team delivered a vibrant, flexible space under budget and program, enhancing functionality and ambiance. Café C now thrives as the campus’s go-to coffee hub, exceeding expectations.
Moreton Bay Collaboration Hub

UniSC’s Collaboration Hub transformed a challenging campus space into a functional, inspiring environment, connecting graduates with industry. Our team optimised the compact area to meet program and budget requirements, positioning the UniSC Moreton Bay campus as a regional hub for innovation.
X Block HSE Meeting Spaces Level 1

This small, impactful lump sum fitout created modern office spaces and meeting rooms for QUT’s health and safety team. Leveraging a team from another project in the building, our team delivered a stress-free experience by completing the project on time, within budget, and without disrupting the day-to-day operations of the building.
Patina at Alumni Court

UQ envisioned a fine dining facility at the Radon Building on their St. Lucia campus, requiring price and program certainty and heritage expertise. Our team provided design and buildability input, delivered the project on time and within budget, bringing the award-winning Patina at Alumni Court to life.
EQUS Quantum Laboratories

This lump-sum project converted a basement plantroom into two high-tech labs, including accessibility upgrades and an electromagnetic field to block external interference. Coordinating precise services in an occupied building posed a complex and rewarding challenge.
Mansergh Shaw Engineering Workshops

We successfully delivered the refurbishment of three engineering labs at The University of Queensland, installing new air conditioning and a plant room within an occupied building. Completed on time and within budget, the project met UQ’s high standards for their world-class engineering program.
AIBN ANFF-Q Clean Room

The AIBN ANFF-Q Clean Room upgrade expanded UQ’s advanced fabrication facilities, enabling cutting-edge research in nanotechnology. Delivered within a live PC2 lab, the project met funding milestones, enhanced capabilities, and reinforced ANFF-Q’s role as a leader in innovation.
AIBN Dry Lab

We delivered a state-of-the-art dry laboratory for UQ’s AIBN, replicating desert conditions to support advanced solar battery research. Completed on time and within budget, the facility empowers researchers to drive breakthroughs in solar technology and career development.
Ritchie Building PC2 Laboratory

We transformed level five of UQ’s Ritchie Building into a fully functional PC2 laboratory, including custom air conditioning grills and termite repairs. Delivered on time and within budget, the project met UQ’s high standards while maintaining a live, operational environment.